A construction work schedule and location plan

AI-generated content may be incorrect.

 



 

                                                                                                                    

 

 

 

 


1          introduction.. 4

1.1         PROJECT BACKGROUND.. 4

1.2         SCOPE OF WORKS. 4

1.3         IMPLEMENTATION PROGRAMME.. 5

 

 

 

 

 

 

 

 

 

 

 

 

List of Appendices

 

Appendix A

Construction Works Schedule

Appendix B

Site Location Plan

 

 

 

 

 

 

 

 

 

 

Revision History                                                                                                                                   

Rev. No.

Issue Date

Amendment

Section

Amended

By

1

10-11-2025

First submission

Ting Chi Pan

2

28-11-2025

Amend comments from RSS, ET & IEC

Ting Chi Pan

3

3-12-2025

Amend comments from RSS, ET & IEC

Ting Chi Pan

4

5-12-2025

Amend comments from RSS, ET & IEC

Ting Chi Pan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1                    introduction

The plan is prepared by CREC Joint Venture(CREC JV) for Contract No. NL/2023/10 Tung Chung New Town Extension – Infrastructure Works at Tung Chung Valley, Yu Tung Road and Ma Wan Chung in accordance with the Condition 2.12 of the Environmental Permit No. EP-519/2016 dated 09/08/2016.

1.1              PROJECT BACKGROUND

The development of Tung Chung New Town Extension (TCNTE), comprising Tung Chung East (TCE) and Tung Chung West (TCW), is a mega-scale and complex project aiming to provide land to meet the future housing economic and social development needs of Hong Kong. Due to the fact that the proposed works are geographically separated, the implementation of mega-scale Project is divided into two packages, namely TCE and TCW respectively. In accordance with the tight delivery programme, the Project will be implemented in phases under separate contracts for the developments of TCE and TCW.

1.2               SCOPE OF WORKS

The works to be executed under the Contract involve:

(a)     Site clearance (including, but not limited to, the demolition of the existing building structures);

(b)     Village sewerage works and upgrading works;

(c)     Roadworks (including, but not limited to, provision of run-in / out) at Yu Tung Road;;

(d)     Construction of roads L22 and L24 (including, but not limited to, construction of bridges) with associated infrastructural and geotechnical works;

(e)     Modification of downstream of Tung Chung Stream (including, but not limited to, demolition of an existing bridge, construction of temporary bridges and construction of bridge);

(f)      Construction of sewage pumping stations at Ma Wan Chung and Tung Chung Valley North with associated geotechnical works;

(g)     Tree felling, transplanting and compensatory planting works with associated landscaping works;

(h)     Provision of attenuation & treatment ponds in Area 45E;

(i)       Modification of sewerage network at Tung Chung Road;

(j)       Ground investigation, geotechnical and building instrumentation monitoring works;

(k)     Management, maintenance, operation and servicing of waterfront promenade and CLC buildings;

(l)       Management, maintenance, operation and servicing of the Temporary Yard Waste Workshop;

(m)    Associated civil, geotechnical, structural, building services systems, electrical and mechanical engineering and landscaping works;

(n)     Implementation of environmental mitigation measures, environmental monitoring and audit programme for the works mentioned above; and

(o)     Other works which are shown on the Drawings or specified in the Specifications.

 

1.3        IMPLEMENTATION PROGRAMME

The implementation programme will follow the construction works schedule referred in Appendix A and the location plan is shown in Appendix B.

 

(END)


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix A – Construction Works Schedule

 

 

 

 


 

 

 A close-up of a grid

AI-generated content may be incorrect.

 

 

 

 

 

Appendix B – Site Location Plan

 

 

 

 

 

 

 

 

A map of a city

AI-generated content may be incorrect.

A map of a city

AI-generated content may be incorrect.

A map of a city

AI-generated content may be incorrect.

A map of a city

AI-generated content may be incorrect.

A map of a plane

AI-generated content may be incorrect.

A map of a city

AI-generated content may be incorrect.

A map of a city

AI-generated content may be incorrect.

A map of a city

AI-generated content may be incorrect.