Revision History
|
Rev. No. |
Issue Date |
Amendment Section |
Amended By |
|
1 |
10-11-2025 |
First submission |
Ting Chi Pan |
|
2 |
28-11-2025 |
Amend comments from RSS, ET & IEC |
Ting Chi Pan |
|
3 |
3-12-2025 |
Amend comments from RSS, ET & IEC |
Ting Chi Pan |
|
4 |
5-12-2025 |
Amend comments from RSS, ET & IEC |
Ting Chi Pan |
The plan is prepared by CREC Joint Venture(CREC JV) for Contract No. NL/2023/10 Tung Chung New Town Extension – Infrastructure Works at Tung Chung Valley, Yu Tung Road and Ma Wan Chung in accordance with the Condition 2.12 of the Environmental Permit No. EP-519/2016 dated 09/08/2016.
The works to be executed under the Contract involve:
(a) Site clearance (including, but not limited to, the demolition of the existing building structures);
(b) Village sewerage works and upgrading works;
(c) Roadworks (including, but not limited to, provision of run-in / out) at Yu Tung Road;;
(d) Construction of roads L22 and L24 (including, but not limited to, construction of bridges) with associated infrastructural and geotechnical works;
(e) Modification of downstream of Tung Chung Stream (including, but not limited to, demolition of an existing bridge, construction of temporary bridges and construction of bridge);
(f) Construction of sewage pumping stations at Ma Wan Chung and Tung Chung Valley North with associated geotechnical works;
(g) Tree felling, transplanting and compensatory planting works with associated landscaping works;
(h) Provision of attenuation & treatment ponds in Area 45E;
(i) Modification of sewerage network at Tung Chung Road;
(j) Ground investigation, geotechnical and building instrumentation monitoring works;
(k) Management, maintenance, operation and servicing of waterfront promenade and CLC buildings;
(l) Management, maintenance, operation and servicing of the Temporary Yard Waste Workshop;
(m) Associated civil, geotechnical, structural, building services systems, electrical and mechanical engineering and landscaping works;
(n) Implementation of environmental mitigation measures, environmental monitoring and audit programme for the works mentioned above; and
(o) Other works which are shown on the Drawings or specified in the Specifications.
The implementation programme will follow the construction works schedule referred in Appendix A and the location plan is shown in Appendix B.
(END)
Appendix A – Construction Works Schedule

Appendix B – Site Location Plan